Togal.CHAT Prompts

Save time with Togal.CHAT prompts

Incorporate Togal.CHAT prompts into your takeoff workflow for meeting prep, RFI summaries, follow-ups, and more with one click.

Before Using Togal.CHAT Prompts

Togal Chat Does Not:

  • Perform takeoff automatically

  • Access the internet

  • Know anything outside the documents you have uploaded

  • Replace professional judgment, field experience, or a full bid review process

Togal Chat Does:

  • Analyze drawings and specs you upload into a project

  • Answer questions based on what is shown or written in those documents

  • Help you move faster through large or complex document sets

  • Generate structured RFIs, scope summaries, and risk flags based on project content

  • Compare two drawing sets and identify changes

Note: The quality of your output depends entirely on the uploaded drawings and specifications. Always upload clean and well-labeled documents to produce stronger results.

Feel free to copy & paste the examples below into your project today.

General prompts

Input specific trade or material type in every "Blank" section for your project.

  1. Create a detailed summary of this project as it pertains to a[BLANK]contractor

  2. Create a detailed summary for [BLANK] finishes

  3. Create a detailed RFP for [BLANK] on this project

  4. Create an RFI for [BLANK] finishes on this project

Prompts by trade

Trade-specific prompts that actually fit your work

  1. GC

    Based on the uploaded project drawings and specifications, write a comprehensive Scope of Work for the Division 10 specialties contractor.

    Organize by:

    • Submittals and product data

    • Shop drawings (if required)

    • Delivery and storage

    • Installation by item type

    • Mounting and anchorage

    • Coordination with blocking and framing

    • ADA compliance

    • Protection and cleaning

    • Closeout requirements for each category

    ONLY INCLUDE SCOPE SHOWN IN THE DOCUMENTS

    Provide sheet numbers and specification section references.

  2. Drywall

    Provide value engineering suggestions for the Division 02 demolition scope

    Summarize the baseline demolition approach and proposed alternative

    Reference relevant sheets or specifications

  3. Painting

    Provide a total estimated wall count of:

    • Painting and coatings Wall coverings

    • Surface preparation

    • Protection and touch-up for this set

    Provide sheet numbers and specification section references

  4. Demolition

    Extract all specification requirements for Division 02 demolition.

    Include:

    • Demolition procedures

    • Environmental controls

    • Dust and noise control standards

    • Vibration monitoring requirements

    • Salvage handling

    • Temporary protection standards

    • Hazardous material coordination requirements

    • Disposal and recycling requirements

    Provide specification section numbers and page references.

  5. Cabinetry

    Review the uploaded project drawings and specifications and generate a detailed summary of the Division 06 wood and millwork scope.

    Organize by:

    • Plastic Laminate Casework

    • Wood Veneer Casework

    • Custom Millwork Elements

    • Wall Paneling

    • Trim and Finish Carpentry

    • Wood Blocking and Backing

    • Countertops (if included in Division 06)

    • Shelving and Closet Systems

    For each system, include:

    • Casework type and construction standard

    • Materials and core type

    • Finish type and veneer species

    • Hardware requirements

    • Dimensions and heights

    • Support and anchorage requirements

    • Coordination with MEP and adjacent finishes

    • ADA or code-related requirements

    • Consolidate identical casework types across sheets

    • Only include systems explicitly shown in the project documents

    Provide sheet numbers and specification section references.

  6. Plumbing

    Identify slab penetrations, underground rough-in requirements, and wall sleeves affecting Division 22 plumbing scope.

    Provide sheet references.